Horizontal Well Intervention, Re-Stimulation & Remedial Workover Optimization 2014

Venue: DoubleTree by Hilton Hotel Houston

Location: Houston, Texas, United States

Event Date/Time: Apr 23, 2014 / 8:30 am - (CST) End Date/Time: Apr 24, 2014 / 4:50 pm - (CST)
Report as Spam


The Horizontal Well Intervention, Re-Stimulation & Remedial Workover Optimization 2014 is the only E&P led forum to provide technical talks and case study based strategies on effective optimization and cost reduction of both workovers and remedial well interventions. Senior E&P presenters will examine techniques for optimizing plug drillouts, cleanouts, coiled tubing interventions, casing repairs and fishing and evaluate how to enable re-completions in depleting wells. The content of the detailed two-day agenda has been created entirely by workover and intervention professional across American unconventional oil and gas operators.

Over two days, production, intervention and completions industry experts will evaluate the most reliable new developments in well servicing tools and technology including coiled tubing strength, fiber optic cable, eline and conveyance tools, expandable casings, workover fluid and corrosion mitigation innovations, straddle packers and dissolvable frac plugs and evaluate the cost of stick pipe vs coiled tubing interventions to determine the most cost effective investment in well interventions is achieved. Over 18 presentations will be delivered across the following key themes:

  • DRILLOUTS: Examining speed, availability, and reach of stick pipe vs. coiled tubing drillouts to identify which method is most cost effective
  • MILLING OPTIMIZATION: Comparing methods for selecting BHA and optimizing milling operations to shorten drillout time and effectively clean the hole
  • CORROSION MITIGATION: Examining chemical, mechanical and physical barriers against corrosion development and how to target highly corrosive zones to cost-effectively reduce pipe damage
  • RE-COMPLETIONS: Strategies for recording and analyzing well conditions in depleting wells to locate un-stimulated zones and select optimal wells for re-completions
  • FLUID DIVERSION & ZONAL ISOLATION: How to reduce formation communication between existing perforations and annulus to achieve a high enough pressure and flow rate for re-completion
  • CASING REPAIRS: The comparative benefits, cost and applications for cement squeezes, patches and innovations in cementing to optimize remedial casing repairs


6 E Greenway Plaza
United States