Niobrara Completions & Well Spacing Congress 2014

Venue: Sheraton Denver West Hotel

Location: Dever, Alabama, United States

Event Date/Time: Nov 18, 2014 End Date/Time: Nov 19, 2014
Report as Spam

Description

 

Oil production in the Niobrara has almost doubled from less than 200 barrels per day in 2012 to almost 400 barrels per day in 2014, whilst rig counts have more than tripled from 20 to 70 in the same period. This rapid expansion is only set to accelerate, with latest reports showing that Niobrara operators collectively are expected to invest over $7 billion in the play in the next year.    With most of the key acreage bought up and sweet spots now identified, the focus of operators in the Niobrara has now moved to maximizing the productivity and economics of their wells. To do this they need to identify the optimal well spacing, completions techniques and lateral lengths to drive increased production rates.   The inaugural Niobrara Completions & Well Spacing Congress 2014 will be the first event to gather up-to-the-minute case studies from the leading E&Ps in the Niobrara to determine the completions and well spacing strategies that are optimizing productivity in the play. Consisting 100% of operator case studies using real life production data, each presentation will be from work done specifically in the play.  

Venue

360 Union Blvd
Dever
Alabama
United States
MORE INFO ON THIS VENUE