Venue: Shangri-la Pudong,Shanghai

Location: Shanghai, China

Event Date/Time: Aug 25, 2004 End Date/Time: Aug 26, 2004
Registration Date: Aug 20, 2004
Report as Spam


The existing information system in the company is used as a data basis and advanced in terms of the quality of data. Every material movement in the material flow is recorded,after which these material data are allocated to the physical material flows in a period-oriented way. Next, the material is valued not only by its purchasing price,but also by the system costs,the costs that have occured in processing the materials so far. By exactly knowing the quantities of the material and the location of it, the material cost can be very accurately calculated at any moment of time. The results,at any preferred level of detail will be showed in material flow reports. These reports give a very clear picture of the current quantity,value and costs of the material in the company. Hereby a difference is made between added-value material flows and material losses.
This seminar is also held on the 9-10th September 2004 at the Shangri-La Hotel,Bangkok


Additional Information

US$995/- per 2day workshop. Contact details: for enquiries