Multiphase Pumping & Metering Technologies 2006
Venue: Kuala Lumpur
Location: Kuala Lumpur, Malaysia
Event Date/Time: Aug 29, 2006 | End Date/Time: Aug 30, 2006 |
Description
• Design, control and operational issues considerations for multiphase-pump packages and associated equipment
• Recent field experience with multiphase pumping, metering and wet-gas metering
• Multiphase meter and wet-gas meter qualification, field testing and selection
If you want to attend as a delegate or feature a case study, contact Edsel Mercado Jr., Senior Conference Manager on 65 6722 9388, email: enquiry@iqpc.com.sg or visit www.oilandgasiq.com/AS-3377/web