Flow Assurance 2010

Venue: Marcliffe Hotel

Location: Aberdeen, United Kingdom

Event Date/Time: Jan 26, 2010 End Date/Time: Jan 28, 2010
Early Registration Date: Sep 25, 2009
Report as Spam


A successful flow rate is crucial to increasing production and avoiding the need for costly pipeline maintenance and repair. With so many factors around that can cause flow to be disrupted (hydrate build up, wax deposit, scaling), it is essential to understand the different options available to minimise blockages.

This event will bring together operator-led case studies that will deliver first hand examples of the various techniques available to break down deposits, avoid build up and increase flow. From chemical injections and thermal management to risk prediction and monitoring, the event will share all you need to know to ensure your hydrocarbons get from A to B efficiently.

For more information:
Visit: http://www.flowassurance.org/Event.aspx?id=222198&MAC=FLOWEDIARY
Call: +44 207 368 9300
Email: enquire@iqpc.co.uk